Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3948.15
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Sep 08, 2022     Baggage door; Top skin rivets; R side vertical channel cap; Misc. - (4 hours)       Category: Fuselage
Did a bunch of miscellaneous projects today:

1. Prepped and painted the baggage door hinge support channel and spacer.

2. Touched up the paint on numerous areas in the baggage compartment and cockpit.

3. Organized Vans drawings and pulled spare kit parts off the hangar shelves to clean the place up a bit.

4. Filled the hollow stems of any Cherry Max rivets I could find on the airplane. [PHOTO]

5. Riveted the remaining R side vertical channel cap. The left one will be accomplished after I verify the rear seat throttle pushrod has enough clearance, and after I receive my shipment of more LPS4-3 rivets. [PHOTO]

6. Worked on getting the vertical stabilizer cap to fit better.

7. Studied the construction steps for the baggage door.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.