Did a bunch of miscellaneous projects today:
1. Prepped and painted the baggage door hinge support channel and spacer.
2. Touched up the paint on numerous areas in the baggage compartment and cockpit.
3. Organized Vans drawings and pulled spare kit parts off the hangar shelves to clean the place up a bit.
4. Filled the hollow stems of any Cherry Max rivets I could find on the airplane. [PHOTO]
5. Riveted the remaining R side vertical channel cap. The left one will be accomplished after I verify the rear seat throttle pushrod has enough clearance, and after I receive my shipment of more LPS4-3 rivets. [PHOTO]
6. Worked on getting the vertical stabilizer cap to fit better.
7. Studied the construction steps for the baggage door.